The G & T Projects team has recently completed the workshop prefabrication, delivery and on-site assembly of 6 x 3m ducts and 1 x sump/vessel. This EPC project required the use of #3Dmodeling modelling technology to accurately assess the geometric dimensions and condition of the existing equipment (Ex 316l) so that the replacement equipment (Ex SAF 2205) would tie in easily. It is a privilege to be a part of the young and dynamic family that is G & T Projects.